|
its really not that important, its just annoying to have that light shining in your face. So you should get it done as soon as you can (just in case something really does go wrong), but it won't hurt to go for like a month with it like that. If it were me I would try to get it done within a week or 2
__________________
'01 Black Sentra SE
Weapon-R intake, HS header, HKS catback, ES motor mounts, B&M short shifter, Tein coilovers
Alpine 9835, Adire Koda 6.1, Adire Brahma 15, Arc 2100cxl, Linear Power 2.2hv, Cadence ZRS-8
'05 Silver WRX STi
Injen SES Downpipe, HKS Carbon-Ti catback, Cobb Stage 2 Tune, TiC Super Shifter, TiC Klunk Killer, Tein springs, Nitto NT555R Drag Radials
|