I got a deadline fast approaching, so I got back to work on this one over the weekend.
One of the things I needed to tackle next was getting the engine installed. But before I could do that I needed to get all the brake lines run, and master cylinders. I made up three new3 master cylinders from styrene stock, crimp tubes, and Pro Tech aluminum caps and installed them onto the firewall. From there I ran all the brake lines using Detail Master #1 fitting line and Pro Tech t-fittings. I also ran the power steering lines and added a Detail Master P/S tank to the frame. At this point it's pretty much ready fro the engine to drop in.
I also did a bit more to the interior. Fire bottles are finished, and I added the fuel line tube through the cockpit.
And finally, I had a few more small things left to do on the engine. I finished up the headers, last few oil lines, and new shifter linkages from RB Motion. The engine is now ready to be installed. Once it's in, it's all downhill from there!
Thanks for looking......
ClayK