More images.
First one is the intercooler being constructed of CA , tubing, and spot putty form Bondo.
The second is the Blowoff valve(-no it doesn't belong there) on top of the Carbon Fiber Decaled hood. The blowoff valve is a bit blurry.
The third is the engine with intake plumbing with Carbon/ Kevlar decal and turbo setup primered. There are spark plug wires, fuel rail, radiator cap, throttle linkage in the engine bay now. I don't think you can see the radiator cap though-need to paint silver. The engine bay is 90% done in the photo.
The last picture is the intercooler primered and test fitted into front end.
1:
2:
3:
4:Nice Smile Its wearing braces
