|
Re: computer readiness tests
There is a specific drive cycle required to set all the monitors, includes a cold start, a period of idling, slowing down from 55 after 10 minutes at that speed, not using the brakes. The insp facility should be able to printout out the procedure as it varies somewhat by mfg.
|