View Single Post
  #2  
Old 01-05-2006, 08:41 AM
maxwedge maxwedge is offline
A990 racer
 
Join Date: Mar 2002
Posts: 17,063
Thanks: 26
Thanked 383 Times in 374 Posts
Re: computer readiness tests

There is a specific drive cycle required to set all the monitors, includes a cold start, a period of idling, slowing down from 55 after 10 minutes at that speed, not using the brakes. The insp facility should be able to printout out the procedure as it varies somewhat by mfg.
Reply With Quote