This is going pretty slow because it's been a very hot Summer with temperatures reaching 104 ºF (40 ºC)..It's been very tough on the forests too, everything is burning..
The swingarm was filled with epoxy filler and the stand supports were replaced with PE ones from LionRoar's set (wich is brilliant, I might add)
If you look closely, you can see that I also closed the shock absorver "hole" with styrene sheet. It now has a much cleaner and real look to it
The frame received the same treatment. You can also notice the bracket for the fuel tank. It's just a test part made out of 0.2mm brass sheet to check the correct dimensions.
That's it for now. Thanks for looking.
Cheers.