|
i don't wanna spend much more than $5000 on the engine/tranny swap, after that, it doesnt matter. I want to be able to do atleast 90% of the install, with less than 2 weeks down time for the swap. I am rather handy, but the install shouldnt take too much custom work, such as machining.By too much, i mean more than one trip to an outside source.
|