Hi,
Small update on my Gypsy rebuild project J. Soon after buying it, I gave my gypsy for small touch up work (In Mysore) but the tinker brain washed me and took my gypsy for a Repainting L.
Week 1: All the electrical, Seats have been ripped off. (first image attached)
Week 2: Work is going very slow. My dad goes every day here to monitor the work progress, If feel sorry for him L
Now almost all the outer body has been scrapped. This is how it look’s after scraping the old paint. (Second, third and fourth image attached)