More progress.
Engine work has begun, drilled out the spark plugs with 0.5mm drill.
Turbos mocked up to begin headers.
Engine pinned with 0.8mm brass rod to make connections for intake and exhaust.
Exhaust manifold made with 2mm styrene rod heated and bent.
Inlet manifold made so engine can be seen when hatch is open
Primer is dry, so had to have a mock up for motivation
Thanks for looking